Grote 82-flb-70a Fusible Link – 13/16″ Axial Male Terminal (long Lead), Brown – 82-FLB-70A

Sale!

Grote 82-flb-70a Fusible Link – 13/16″ Axial Male Terminal (long Lead), Brown – 82-FLB-70A

Original price was: $9.57.Current price is: $2.97.

Category: Tag:

Description

Fast acting and cost-effective, high-current automotive fuses for use in automotive, battery, and general DC application. Bolts into fuse block, 13/16″ bolt terminal Available amps range from 20A to 120A. Automotive Bolt-In Car Fuse Link Terminations. Used primarily in Japanese-designed vehicles for wiring harness protection.
Bolts into fuse block, 13/16″ bolt terminal
Available amps range from 20A to 120A
Automotive Bolt-In Car Fuse Link Terminations
Used primarily in Japanese-designed vehicles for wiring harness protection

Reviews

There are no reviews yet.

Be the first to review “Grote 82-flb-70a Fusible Link – 13/16″ Axial Male Terminal (long Lead), Brown – 82-FLB-70A”

Your email address will not be published. Required fields are marked *